Pingtung
First Floating Solar Project Site in Taiwan
Year: 2016
Capacity: 499KW
After the Typhoon Morakot, the Pingtung County Government strengthened the embankment, built a pumping station, and set up a detention pond. At the same time, they launched a "water cultivation and power generation" project and established the first floating solar system at the detention pond in Jiadong Township. The system has a daily power output enough for 94 households.
Related reports:
https://shorturl.at/stIOV
https://e-info.org.tw/node/113342
https://www.storm.mg/article/82386
https://www.cna.com.tw/news/afe/201602180249.aspx
https://www.epochtimes.com/b5/16/2/18/n4643033.htm
https://shorturl.at/wzEJQ
https://shorturl.at/elvY0